「On the morning of the third day.」
"Commander, the final batch of 'Standard Patrol Golem Power Core - Type III' has been packaged."
Jarvis's voice rang in Allen's mind. "All 500 sets of Type-V joint modules have passed quality inspection, with a tolerance three times tighter than the blueprint's specifications. The 200 Type-III power cores have a combined energy output stability error rate of 0.12%, far below the 0.5% required by the blueprints."
The results were as expected.
For Cybertron, which could now produce Level 3 Golems, taking on a D-rank production task like this was complete overkill.
Allen sat in his study at Deep Blue Residence. He used his personal terminal to submit the delivery request through the Association's internal system.
A prompt immediately appeared on the light screen.
[Task PR-2291 has been submitted.]
[Standard Timeframe: 240 hours. Actual Time Taken: 68 hours. Completed 172 hours ahead of schedule.]
