The data on the control panel screen swiftly fluctuated, the water flow rate soaring rapidly.
When the water impacted the turbine wheel, the massive wheel began to slowly rotate with the main shaft, the needle on the tachometer steadily rising, and the screen simultaneously popped up a series of green indicators such as "Turbine synchronously rotating normally," "Guide vane angle adapted," "Flow channel unobstructed," etc.
Engineer Li and Engineer Qian immediately bent over, quickly recording various real-time data, laying the foundation for precise adjustments later.
About twenty minutes later, the unit's operation in no-load mode was stable, the main shaft speed fixed at the rated value, and key indicators such as bearing temperature and equipment vibration amplitude were all controlled within the standard range, without any anomalies.